Modernisation of AV Infrastructure at the Intercontinental Hotel in Warsaw

Category
AV installations

The project included the replacement of three electric lifts and three projectors, each with an output of 7500 ANSI lumens, supporting resolutions up to Full HD. The high quality of projection would not be possible without the replacement of the entire wiring system with a modern digital HDBaseT setup featuring Gefen receivers and transmitters. Three rooms were also fitted with new connectors enabling a computer setup with a digital or analogue input. Each of them was equipped with a Gefen scaler that enables adjusting the projection to the screen. We designed and installed new software for the CUE control system which enables easier and more intuitive control of projection, blinds, lighting, and screens. The system uses three iPads built into the wall and one mobile unit.